Skip to content

Step 19: Insulation

September 27, 2012

Now that the systems(plumbing, electrical and HVAC) have been installed it’s time to insulate the house.  We use R-49 in the ceiling, R-38 in the floor and R-21 in the exterior walls.  In this picture you can see the walls(pink), the ceiling(brown) and you can also the foam board insulation(grey) above the windows.  You can also see the plastic wrap that we put over the wall insulation to help prevent air leakage around the insulation.

Image

Advertisement

From → Uncategorized

Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: